13
/ 16
7Goldsworthy LL 2ndBedroom 2008NOV07 013
I will be replacing 3 of the timber floor joists with a steel "I" beam in order to remove a couple of concrete pillars.
I will be replacing 3 of the timber floor joists with a steel "I" beam in order to remove a couple of concrete pillars.